9099 N Deerbrook Trail, Brown Deer, WI 53223 Mon–Fri 8–5 · Sat 10–4 · (414) 710-0106

Lead service lines · Whitefish Bay

Lead pipe replacement in Whitefish Bay

What the numbers say, what the village is doing, and what you can do about it before your street comes up on the schedule.

56%

of Whitefish Bay homes are served by a lead service line.

How Whitefish Bay compares

That is lower than Shorewood at 82% and lower than Milwaukee at over 70% — but 56% still means more than half the village.

Whitefish Bay follows a mandatory, EPA-scheduled replacement programme with full inventory transparency, rather than Milwaukee’s largely voluntary approach. That means public-side removal moves faster and private-side work is coordinated with it — which is good news, provided you know when your street comes up.

The 2037 deadline applies here

The EPA’s Lead and Copper Rule Improvements requires every lead service line in the country to be replaced by 1 January 2037. Whitefish Bay is working to a phased schedule: inventory and corrosion control through 2025, highest-risk public lines near schools and daycare centres from 2025, joint public/private excavations from 2028, and everything remaining by 2037.

If your street is not high-priority, that can mean waiting into the 2030s.

The split that catches people out

SegmentWho replaces it
Main to curb stopVillage of Whitefish Bay — no cost to you
Curb stop to your meterYou — typically $6,000–$10,000

When the village says it is replacing your lead line, that usually means the half in the street. The half under your garden is yours to arrange and pay for — though DNR loans, Bipartisan Infrastructure Law grants and village subsidies for low-income residents can all reduce it, and a subsidy is not taxable income.

What to do this week

  1. Look up your address on the Village of Whitefish Bay Lead Service Line Inventory.
  2. Scratch the pipe where it enters your basement. Dull grey and soft means lead; reddish means copper.
  3. Get a first-draw lab test — water that has stood six hours. Above 10 ppb is the EPA action level; above 5 ppb warrants action now.
  4. Flush the cold tap 30–60 seconds before drinking, and never cook or make up formula with hot water.
  5. Use a filter certified to NSF/ANSI 53 — the standard that actually covers lead reduction.

Read the full guide — testing, costs, funding and timelines

Where filtration fits

Whole-house filtration is not a substitute for replacing a lead service line. Replacement is the permanent fix and we won’t pretend otherwise.

What it does is cover the years in between, at every tap rather than one. If lead is your concern, tell us — it changes which model and cartridge we’d recommend, and we’ll give you the NSF/ANSI 53 certification for that specific filter in writing.

Talk to us about your water